Test Connectivity

Admin Center lets you test communications between your MJS node, worker nodes, and the node where Admin Center is running.

The tests are divided into four categories:

  • Client — Verifies that the node running Admin Center is properly configured so that further cluster testing can proceed.

  • Client to Nodes — Verifies that the node running Admin Center can identify and communicate with the other nodes in the cluster.

  • Nodes to Nodes — Verifies that the other nodes in the cluster can identify each other, and that each node allows its mdce service to communicate with the mdce service on the other cluster nodes.

  • Nodes to Client — Verifies that other cluster nodes can identify and communicate with the node running Admin Center.

First click Test Connectivity to open the Connectivity Testing dialog box. By default, the dialog box displays the results of the last test. To run new tests and update the display, click Run.

During test execution, Admin Center displays this progress dialog box.

When the tests are complete, the Running Tests dialog box automatically closes, and Admin Center displays the test results in the Connectivity Testing dialog box.

The possible test result symbols are described in the following table.

Test ResultDescription

Test passed.

Test passed, extra information is available.

Test passed, but generated a warning.

Test failed.

Test was skipped, possibly because prerequisite tests did not pass.

Test that include failures or other results might look like the following figure.

Double-click any of the symbols in the test results to drill down for more detail. Use the Log tab to see the raw data from the tests.

The results of the tests that run on only the client are displayed in the lower-left corner of the dialog box. To drill into client-only test results, click More Info.

Was this topic helpful?