GARANT COMMANDS: load reference peaks - load second list of measured peaks usage: load reference peaks The peak list is read and the peaks are associated to the specified spectrum . All information stored in the peak list is read with exception of the peak assignments. The peaks are used together with the match command. see also: write reference peaks, load peaks, match